Photovoltaic plant in operation

back to News

Time to act! The installation and commissioning of the PV system is an important step for us on our way to becoming CO2-neutral by 2030.

1,574 modules provide for a planned annual electricity production of 671,490 kWh, which corresponds to around 663 people or 166 households.

A total of three expansion stages are possible. The second stage is planned for autumn 2023 in conjunction with a heat pump to heat all the buildings.